TreatmentWalls

Vertical wall repair Basal wall repair repointing (sq ft) masonry (sq ft) stone site (number) stone fresh (number) capping (linear feet) mortar (number of buckets) Comments Notes
8.000 - 5.000 - - 0.500 John Atencio Jr. worked in this room.  
Edit Delete Show
- - - - - - Emergency Stabilization  
Edit Delete Show
4.000 8.000 - 2.000 - 2.000 Harold Suina worked in this room.  
Edit Delete Show
- - - - - - There is no preservation documentation form for...  
Edit Delete Show
60.000 10.000 28.000 - - 2.000 Harold Suina worked in this room.  
Edit Delete Show
3.000 - - - - 0.500    
Edit Delete Show
- - 3.000 - 3.000 0.500 Paul Tso worked in this room.  
Edit Delete Show
4.000 - 2.000 - - 0.500 James Yazzie worked in this room.  
Edit Delete Show
48.000 - 7.000 - - 2.000    
Edit Delete Show
9.000 - 6.000 - - 1.000 Leo Chiquito worked in this room.  
Edit Delete Show
3.000 - 13.000 - - 4.000 John Atencio worked in this room. There is no ...  
Edit Delete Show
18.000 - 4.000 - - 1.500 Garry Joe worked in this room.  
Edit Delete Show
30.000 - 23.000 - 8.000 -    
Edit Delete Show
- - - - - - There is no preservation documentation form for...  
Edit Delete Show
- - - - - - Patching and grouting the wall was done in soil...  
Edit Delete Show