Show Treatment wall

Vertical wall repair
 
Basal wall repair
 
repointing (sq ft)
30.000  
masonry (sq ft)
-  
stone site (number)
23.000  
stone fresh (number)
-  
capping (linear feet)
8.000  
mortar (number of buckets)
-  
Comments

 
Notes