Show Treatment wall

Vertical wall repair
 
Basal wall repair
 
repointing (sq ft)
3.000  
masonry (sq ft)
-  
stone site (number)
13.000  
stone fresh (number)
-  
capping (linear feet)
-  
mortar (number of buckets)
4.000  
Comments

John Atencio worked in this room. There is no after photo available.

 
Notes