TreatmentWalls

Vertical wall repair Basal wall repair repointing (sq ft) masonry (sq ft) stone site (number) stone fresh (number) capping (linear feet) mortar (number of buckets) Comments Notes
3.000 - 2.000 - - 0.250 Leo Chiquito worked in this room.  
Edit Delete Show
- - 3.000 - 2.000 0.750 Garry Joe worked in this room.  
Edit Delete Show
- - - - - - Patching and grouting the wall was done in soil...  
Edit Delete Show
8.000 - - - - 0.250 Paul Tso and Leo Chiquito worked in this room.  
Edit Delete Show
20.000 2.000 - - - 1.000    
Edit Delete Show
16.000 - 7.000 - - 3.000    
Edit Delete Show
- - - - - - Patching and grouting the wall was done in soil...  
Edit Delete Show
17.000 - 2.000 - - 0.750 Leo H. Chiquito worked in this room.  
Edit Delete Show
- - - - - - A large section of the east wall measuring 8' a...  
Edit Delete Show
- - - - - - There is no preservation documentation form for...  
Edit Delete Show
14.000 - 10.000 - - 1.500 Leo Chiquito and John Atencio both worked in th...  
Edit Delete Show
5.000 - - - - 0.500 Paul Tso Sr. worked in this room.  
Edit Delete Show
- - 6.000 - 3.000 0.500 Garry Joe worked in this room.  
Edit Delete Show
6.000 - 6.000 - 9.000 3.000 Leo Chiquito and Ben Charley both worked in thi...  
Edit Delete Show
- - - - - - Cecil Werito Sr. and three other preservation c...  
Edit Delete Show