TreatmentWalls

Vertical wall repair Basal wall repair repointing (sq ft) masonry (sq ft) stone site (number) stone fresh (number) capping (linear feet) mortar (number of buckets) Comments Notes
53.000 - 70.000 - - 6.000 Leo Chiquito worked in this room.  
Edit Delete Show
- - - - - - Patching and grouting the wall was done in soil...  
Edit Delete Show
- - - - - - Patching and grouting the wall was done in soil...  
Edit Delete Show
68.000 - 6.000 - - 5.000    
Edit Delete Show
1.000 - 2.000 - - 0.250    
Edit Delete Show
- - - - - - There is no preservation documentation form for...  
Edit Delete Show
- - - - - - There is no after photo available because there...  
Edit Delete Show
- - - - - - Patching and grouting the wall was done in soil...  
Edit Delete Show
- - 22.000 - 10.000 3.500 Garry Joe worked in this room.  
Edit Delete Show
- - - - - - Patching and grouting the wall was done in soil...  
Edit Delete Show
11.000 - - - - 0.500 Leo Chiquito worked in this room.  
Edit Delete Show
- - - - - - Patching and grouting the wall was done in soil...  
Edit Delete Show
- - - - 25.000 3.000 Douglas Norberto worked in this room.  
Edit Delete Show
- - - - - - Patching and grouting the wall was done in soil...  
Edit Delete Show
8.200 - 5.000 - - 0.750    
Edit Delete Show