TreatmentWalls

Vertical wall repair Basal wall repair repointing (sq ft) masonry (sq ft) stone site (number) stone fresh (number) capping (linear feet) mortar (number of buckets) Comments Notes
12.000 - 6.000 - - 1.000 Garry Joe worked in this room.  
Edit Delete Show
- - - - - - There is no preservation documentation form for...  
Edit Delete Show
46.000 2.000 21.000 - - 4.000 Paul Tso worked in this room.  
Edit Delete Show
9.000 - 10.000 - - 1.000 Leo H. Chiquito and John Atencio Jr. both worke...  
Edit Delete Show
- - - - - - Date work started: June 30, 1971 and date work ...  
Edit Delete Show
20.000 - 9.000 - 9.000 7.000 Jack Trujillo worked in this room.  
Edit Delete Show
16.000 2.000 - - - 2.000 Ben Charley worked in this room.  
Edit Delete Show
- - - - - -    
Edit Delete Show
6.000 - 5.000 - - 1.000 Leo Chiquito worked in this room.  
Edit Delete Show
18.000 - - - - 0.500    
Edit Delete Show
3.000 - 10.000 - - 2.000 John Atencio Jr. worked in this room but there ...  
Edit Delete Show
24.000 - - - 9.000 0.500 Jack Trujillo and Garry Joe both worked in this...  
Edit Delete Show
116.000 - - - - 2.500    
Edit Delete Show
10.000 - 5.000 - - 1.000 Leo Chiquito worked in this room.  
Edit Delete Show
- - - - - - Patching and grouting the wall was done in soil...  
Edit Delete Show