|
|
-
|
-
|
9.000
|
-
|
3.000
|
1.000
|
Paul Tso worked in this room.
|
|
|
|
|
-
|
-
|
-
|
-
|
-
|
-
|
9 Gallons resin 46 Gallon water mixed in 55 gal...
|
|
|
|
|
-
|
-
|
-
|
-
|
-
|
-
|
Patching and grouting the wall was done in soil...
|
|
|
|
|
24.000
|
8.000
|
-
|
22.000
|
-
|
6.000
|
Harold Suina worked in this room.
|
|
|
|
|
3.000
|
3.000
|
7.000
|
-
|
-
|
0.500
|
Harold Suina worked in this room.
|
|
|
|
|
14.000
|
-
|
40.000
|
-
|
14.000
|
14.000
|
James Yazzie, Harold Suina and John Atencio Jr....
|
|
|
|
|
15.000
|
-
|
2.000
|
-
|
-
|
2.000
|
Douglas Norberto and Paul Tso both worked in th...
|
|
|
|
|
12.000
|
-
|
20.000
|
-
|
-
|
1.250
|
Leo Chiquito worked in this room.
|
|
|
|
|
-
|
-
|
-
|
-
|
-
|
-
|
Patching and grouting the wall was done in soil...
|
|
|
|
|
13.000
|
-
|
-
|
-
|
-
|
0.250
|
John Atencio worked in this room.
|
|
|
|
|
45.000
|
45.000
|
58.000
|
-
|
45.000
|
6.000
|
Paul Tso, Harold Suina and John Atencio all wor...
|
|
|
|
|
18.000
|
-
|
5.000
|
-
|
-
|
2.000
|
Douglas Norberto worked in this room.
|
|
|
|
|
26.000
|
-
|
5.000
|
-
|
-
|
1.500
|
|
|
|
|
|
34.000
|
34.000
|
4.000
|
-
|
-
|
7.500
|
James Yazzie worked in this room.
|
|
|
|
|
15.000
|
-
|
7.000
|
-
|
-
|
2.000
|
|
|
|