|
|
0.100
|
-
|
3.000
|
4.000
|
-
|
1.000
|
Paul Tso worked in this room.
|
|
|
|
|
7.000
|
-
|
10.000
|
-
|
7.000
|
2.000
|
James Yazzie, Harold Suina and John Atencio Jr....
|
|
|
|
|
6.000
|
-
|
-
|
-
|
-
|
0.250
|
|
|
|
|
|
6.000
|
-
|
3.000
|
-
|
-
|
0.250
|
|
|
|
|
|
36.000
|
24.000
|
-
|
36.000
|
-
|
8.000
|
Harold Suina worked in this room.
|
|
|
|
|
-
|
-
|
-
|
-
|
-
|
-
|
Patching and grouting the wall was done in soil...
|
|
|
|
|
7.900
|
-
|
2.000
|
-
|
-
|
0.750
|
Douglas Norberto Sr. worked in this room.
|
|
|
|
|
5.000
|
2.000
|
16.000
|
-
|
-
|
3.000
|
Ben Charley worked in this room.
|
|
|
|
|
22.000
|
-
|
-
|
-
|
-
|
1.500
|
Leo H. Chiquito worked in this room.
|
|
|
|
|
60.000
|
-
|
-
|
-
|
22.500
|
5.000
|
Garry Joe worked in this room.
|
|
|
|
|
-
|
-
|
-
|
-
|
-
|
-
|
Ther is no preservation documentation form for ...
|
|
|
|
|
-
|
-
|
7.000
|
-
|
8.000
|
2.000
|
James Yazzie worked in this room.
|
|
|
|
|
16.000
|
-
|
16.000
|
-
|
-
|
2.500
|
|
|
|
|
|
-
|
-
|
-
|
-
|
-
|
-
|
The water drains down on the south from room 10...
|
|
|
|
|
-
|
-
|
-
|
-
|
-
|
-
|
3 part soil, 1 part sand and 1 part cement
|
|
|