TreatmentWalls

Vertical wall repair Basal wall repair repointing (sq ft) masonry (sq ft) stone site (number) stone fresh (number) capping (linear feet) mortar (number of buckets) Comments Notes
15.000 7.000 4.000 - - 2.500 Paul Tso worked in this room.  
Edit Delete Show
14.000 - 2.000 - - 0.500 Garry Joe and Leo Chiquito worked in this room.  
Edit Delete Show
- - - - - - Patching and grouting the wall was done in soil...  
Edit Delete Show
22.000 - 18.000 - - 3.500 Paul Tso worked in this room.  
Edit Delete Show
- - - - - - Patching and grouting the wall was done in soil...  
Edit Delete Show
7.000 1.000 7.000 - - 1.000 Harold Suina worked in this room.  
Edit Delete Show
- - - - - - Patching and grouting the wall was done in soil...  
Edit Delete Show
- - - - - - Patching and grouting the wall was done in soil...  
Edit Delete Show
16.000 - - - - 1.000 Leo H. Chiquito worked in this room.  
Edit Delete Show
- - - - - - Patching and grouting the wall was done in soil...  
Edit Delete Show
11.800 - 34.000 - - 1.750    
Edit Delete Show
- - - - - - Patching and grouting the wall was done in soil...  
Edit Delete Show
- - - - - - There is no preservation documentation form for...  
Edit Delete Show
11.000 3.000 6.000 - - 0.500 Harold Suina worked in this room.  
Edit Delete Show
- - - - - -    
Edit Delete Show