|
|
-
|
-
|
9.000
|
-
|
8.000
|
5.000
|
Paul Tso worked in this room but there is no be...
|
|
|
|
|
-
|
-
|
-
|
-
|
-
|
-
|
There is no preservation documentation form for...
|
|
|
|
|
5.000
|
-
|
-
|
-
|
-
|
0.500
|
|
|
|
|
|
54.000
|
46.000
|
-
|
-
|
-
|
5.000
|
Paul Tso worked in this room.
|
|
|
|
|
-
|
-
|
-
|
-
|
-
|
-
|
|
|
|
|
|
3.000
|
-
|
5.000
|
-
|
-
|
0.750
|
Leo Chiquito worked in this room.
|
|
|
|
|
-
|
-
|
-
|
-
|
-
|
-
|
Patching and grouting the wall was done in soil...
|
|
|
|
|
-
|
-
|
-
|
-
|
-
|
-
|
There is no after photo available because there...
|
|
|
|
|
9.000
|
-
|
5.000
|
-
|
-
|
1.000
|
James Yazzie and Ben Charley both worked in thi...
|
|
|
|
|
10.000
|
-
|
20.000
|
-
|
10.000
|
1.500
|
Garry Joe worked in this room.
|
|
|
|
|
16.000
|
16.000
|
70.000
|
-
|
-
|
4.000
|
Harold Suina and Leo Chiquito both worked in th...
|
|
|
|
|
-
|
-
|
-
|
-
|
-
|
-
|
Patching and grouting the wall was done in soil...
|
|
|
|
|
28.000
|
-
|
-
|
13.000
|
-
|
42.000
|
Robinson Lewis, Doug Norberto, Garry Joe Sr. an...
|
|
|
|
|
-
|
-
|
-
|
-
|
-
|
-
|
Patching and grouting the wall was done in soil...
|
|
|
|
|
-
|
-
|
-
|
-
|
-
|
-
|
1st and 2nd story
|
|
|