TreatmentWalls

Vertical wall repair Basal wall repair repointing (sq ft) masonry (sq ft) stone site (number) stone fresh (number) capping (linear feet) mortar (number of buckets) Comments Notes
24.100 - 24.000 31.000 7.000 6.000 Garry Joe worked in this room.  
Edit Delete Show
- - - - - - There is no preservation documentation for this...  
Edit Delete Show
- - - - - - There is no preservation documentation form for...  
Edit Delete Show
3.500 - 7.000 - 3.500 1.000 Leo H. Chiquito worked in this room.  
Edit Delete Show
48.600 - - - - 2.000    
Edit Delete Show
- - - - - - 9 gallons resin E-330 the 46 gallon water mixed...  
Edit Delete Show
- - 25.000 - 14.000 13.000 Harold Suina worked in this room.  
Edit Delete Show
5.000 - - - - 1.000    
Edit Delete Show
2.500 - - - - 0.500 There is no after photo available because the...  
Edit Delete Show
4.000 - 28.000 - - 8.000 Harold Suina, Garry Joe and John Atencio all wo...  
Edit Delete Show
3.000 - 19.000 - - 0.500    
Edit Delete Show
5.500 - 16.000 - - 2.500 Garry Joe, John Atencio and Paul Tso all worked...  
Edit Delete Show
6.000 - - - - 2.000 The after photo for the South Wall is in the pr...  
Edit Delete Show
- - - - - - There is no preservation documentation form for...  
Edit Delete Show
- - 7.000 - 4.000 1.500 Garry Joe and John Atencio both worked in this ...  
Edit Delete Show