CHCU Preservation Documentation Database
Login
Show Treatment wall
Vertical wall repair
Basal wall repair
repointing (sq ft)
6.000
masonry (sq ft)
-
stone site (number)
-
stone fresh (number)
-
capping (linear feet)
-
mortar (number of buckets)
2.000
Comments
The after photo for the South Wall is in the process of being retaken.
Notes
Close