TreatmentWalls

Vertical wall repair Basal wall repair repointing (sq ft) masonry (sq ft) stone site (number) stone fresh (number) capping (linear feet) mortar (number of buckets) Comments Notes
- - - - - - 9 Gallons of resin E-330 to 46 Gallons water m...  
Edit Delete Show
- - - - - - Patching and grouting the wall was done in soil...  
Edit Delete Show
7.000 - 9.000 - - 1.000 James Yazzie worked in this room.  
Edit Delete Show
- - - - - - "No Treatment" done in this room.  
Edit Delete Show
29.000 - 2.000 - - 3.000 George Beyale Sr. and Chee Mitchell both worked...  
Edit Delete Show
36.000 - 7.000 - - 3.500 George Beyale Sr. and Chee Mitchell both worked...  
Edit Delete Show
63.000 - 36.000 - - 19.000    
Edit Delete Show
- - - - - -    
Edit Delete Show
18.000 - 2.000 - - 1.000 Leo H. Chiquito worked in this room.  
Edit Delete Show
4.000 1.000 12.000 - - 0.500 Harold Suina worked in this room.  
Edit Delete Show
- - - - - -    
Edit Delete Show
8.000 - - - - 1.000 Leo Chiquito worked in this room.  
Edit Delete Show
- - - - - - There is no preservation documentation form for...  
Edit Delete Show
16.000 - 23.000 - - 4.000 James Yazzie worked in this room.  
Edit Delete Show
- - - - - - There is no preservation documentation for this...  
Edit Delete Show