TreatmentWalls

Vertical wall repair Basal wall repair repointing (sq ft) masonry (sq ft) stone site (number) stone fresh (number) capping (linear feet) mortar (number of buckets) Comments Notes
9.000 - - - - 6.000 Douglas Norberto worked in this room.  
Edit Delete Show
- - - - - - Patching and grouting the wall was done in soil...  
Edit Delete Show
- - - - - - 9 gallons resin E-330 the 46 gallon water mixed...  
Edit Delete Show
20.000 - 4.000 - - 0.500    
Edit Delete Show
18.000 - 9.000 - - 2.000 DN., PT., LC., GJ. And HS. all worked in this r...  
Edit Delete Show
114.000 - 3.000 - - 3.500 Garry Joe worked in this room.  
Edit Delete Show
50.000 - 43.000 - - 4.500 Paul Tso and Harold Suina both worked in this r...  
Edit Delete Show
0.480 - 25.000 - - 7.000 Lewis Murphy Jr. worked in this room.  
Edit Delete Show
5.700 - - - - 1.500 Garry Joe Sr. and and Victor Beyale both worked...  
Edit Delete Show
12.000 - - - 6.000 4.000    
Edit Delete Show
- - 6.000 - 3.000 2.000 Douglas Norberto and Robinson Lewis both worked...  
Edit Delete Show
59.000 - 9.000 - - 2.000   no after photo
Edit Delete Show
- - - - - - Date work started: May 19, 1970 and date work f...  
Edit Delete Show
40.000 - 4.000 - - 6.000 James Yazzie worked in this room.  
Edit Delete Show
112.000 - 12.000 - - 4.000 Leo H. Chiquito and John Atencio Jr. both worke...  
Edit Delete Show