|
|
-
|
-
|
-
|
-
|
-
|
-
|
|
|
|
|
|
-
|
-
|
-
|
-
|
-
|
-
|
Patching and grouting the wall was done in soil...
|
|
|
|
|
13.700
|
-
|
11.000
|
-
|
-
|
2.500
|
Garry Joe worked in this room.
|
|
|
|
|
-
|
-
|
-
|
-
|
-
|
-
|
Patching and grouting the wall was done in soil...
|
|
|
|
|
-
|
-
|
-
|
-
|
-
|
-
|
Patching and groutingthe wall was done in soil ...
|
|
|
|
|
5.000
|
-
|
2.000
|
-
|
-
|
1.000
|
Jack Trujillo, John Atencio Jr. and Leo Chiquit...
|
|
|
|
|
8.000
|
-
|
1.000
|
-
|
-
|
0.250
|
Leo H. Chiquito worked in this room.
|
|
|
|
|
52.000
|
-
|
58.000
|
-
|
-
|
7.000
|
Leo Chiquito and John Atencio Jr. both worked i...
|
|
|
|
|
10.000
|
-
|
5.000
|
-
|
-
|
1.000
|
|
|
|
|
|
46.000
|
-
|
-
|
3.000
|
-
|
6.500
|
Paul Tso Sr. and Leo Chiquito both worked
in th...
|
|
|
|
|
-
|
-
|
65.000
|
-
|
8.000
|
6.000
|
Harold Suina worked in thi room.
|
|
|
|
|
4.000
|
-
|
2.000
|
-
|
-
|
1.500
|
|
|
|
|
|
-
|
-
|
-
|
-
|
-
|
-
|
Wall sprayed with resin for testing
|
|
|
|
|
-
|
-
|
-
|
-
|
-
|
-
|
|
|
|
|
|
-
|
-
|
-
|
-
|
-
|
-
|
Patching and grouting the wall was done in soil...
|
|
|