CHCU Preservation Documentation Database
Login
Show Treatment wall
Vertical wall repair
Basal wall repair
repointing (sq ft)
-
masonry (sq ft)
-
stone site (number)
-
stone fresh (number)
-
capping (linear feet)
-
mortar (number of buckets)
-
Comments
There is no after photo available because there was "No Treatment" done on the South Wall.
Notes
Close