CHCU Preservation Documentation Database
Login
Show Treatment wall
Vertical wall repair
Basal wall repair
repointing (sq ft)
1.500
masonry (sq ft)
-
stone site (number)
1.000
stone fresh (number)
-
capping (linear feet)
-
mortar (number of buckets)
0.500
Comments
Paul Tso worked in this room. There was work done but there is no after
photo available.
Notes
Close