Show Treatment wall

Vertical wall repair
 
Basal wall repair
 
repointing (sq ft)
7.000  
masonry (sq ft)
-  
stone site (number)
40.000  
stone fresh (number)
30.000  
capping (linear feet)
15.000  
mortar (number of buckets)
18.000  
Comments

Harold Suina worked in this room.

 
Notes