Show Treatment wall

Vertical wall repair
 
Basal wall repair
 
repointing (sq ft)
7.000  
masonry (sq ft)
-  
stone site (number)
10.000  
stone fresh (number)
-  
capping (linear feet)
7.000  
mortar (number of buckets)
2.000  
Comments

James Yazzie, Harold Suina and John Atencio Jr. all
worked in this room.

 
Notes