Show Treatment wall

Vertical wall repair
 
Basal wall repair
 
repointing (sq ft)
7.000  
masonry (sq ft)
14.000  
stone site (number)
24.000  
stone fresh (number)
20.000  
capping (linear feet)
-  
mortar (number of buckets)
7.000  
Comments

 
Notes