Show Treatment wall

Vertical wall repair
 
Basal wall repair
 
repointing (sq ft)
5.000  
masonry (sq ft)
5.000  
stone site (number)
30.000  
stone fresh (number)
10.000  
capping (linear feet)
5.000  
mortar (number of buckets)
3.000  
Comments

Harold Suina worked in this room.

 
Notes