CHCU Preservation Documentation Database
Login
Show Treatment wall
Vertical wall repair
Basal wall repair
repointing (sq ft)
22.000
masonry (sq ft)
-
stone site (number)
21.000
stone fresh (number)
-
capping (linear feet)
-
mortar (number of buckets)
3.000
Comments
Paul Tso Sr. and Leo Chiquito both worked
in this room.
Notes
Close