CHCU Preservation Documentation Database
Login
Show Treatment wall
Vertical wall repair
Basal wall repair
repointing (sq ft)
-
masonry (sq ft)
-
stone site (number)
4.000
stone fresh (number)
20.000
capping (linear feet)
4.000
mortar (number of buckets)
5.000
Comments
Paul Tso worked in this room.
Notes
Close