CHCU Preservation Documentation Database
Login
Show Treatment wall
Vertical wall repair
Basal wall repair
repointing (sq ft)
-
masonry (sq ft)
-
stone site (number)
6.000
stone fresh (number)
-
capping (linear feet)
4.000
mortar (number of buckets)
1.000
Comments
Garry Joe and John Atencio both worked in this room.
Notes
Close