CHCU Preservation Documentation Database
Login
Show Treatment wall
Vertical wall repair
Basal wall repair
repointing (sq ft)
5.000
masonry (sq ft)
-
stone site (number)
-
stone fresh (number)
-
capping (linear feet)
-
mortar (number of buckets)
0.250
Comments
Paul Tso and Harold Suina worked in this room.
Notes
Close