Show Treatment wall

Vertical wall repair
 
Basal wall repair
 
repointing (sq ft)
15.000  
masonry (sq ft)
-  
stone site (number)
2.000  
stone fresh (number)
6.000  
capping (linear feet)
-  
mortar (number of buckets)
3.500  
Comments

 
Notes