CHCU Preservation Documentation Database
Login
Show Treatment wall
Vertical wall repair
Basal wall repair
repointing (sq ft)
31.000
masonry (sq ft)
-
stone site (number)
50.000
stone fresh (number)
9.000
capping (linear feet)
8.000
mortar (number of buckets)
15.000
Comments
Paul Tso and Harold Suina both worked on the left side of West Wall.
Notes
Close