Show Treatment wall

Vertical wall repair
 
Basal wall repair
 
repointing (sq ft)
8.000  
masonry (sq ft)
2.000  
stone site (number)
7.000  
stone fresh (number)
-  
capping (linear feet)
-  
mortar (number of buckets)
1.000  
Comments

Harold Suina worked in this room. There was work done but there
is no after photo available.

 
Notes