Show Treatment wall

Vertical wall repair
 
Basal wall repair
 
repointing (sq ft)
13.000  
masonry (sq ft)
-  
stone site (number)
13.000  
stone fresh (number)
-  
capping (linear feet)
9.000  
mortar (number of buckets)
2.500  
Comments

Garry Joe and James Yazzie both worked
in this room.

 
Notes