CHCU Preservation Documentation Database
Login
Show Treatment wall
Vertical wall repair
Basal wall repair
repointing (sq ft)
7.000
masonry (sq ft)
-
stone site (number)
9.000
stone fresh (number)
-
capping (linear feet)
-
mortar (number of buckets)
2.500
Comments
Paul Tso worked in this room. There was work done but there is no
after photo available.
Notes
Close