CHCU Preservation Documentation Database
Login
Show Treatment wall
Vertical wall repair
Basal wall repair
repointing (sq ft)
9.000
masonry (sq ft)
7.000
stone site (number)
8.000
stone fresh (number)
-
capping (linear feet)
-
mortar (number of buckets)
1.000
Comments
Harold Suina worked in this room.
Notes
Close