CHCU Preservation Documentation Database
Login
Show Treatment wall
Vertical wall repair
Basal wall repair
repointing (sq ft)
51.400
masonry (sq ft)
-
stone site (number)
3.000
stone fresh (number)
-
capping (linear feet)
-
mortar (number of buckets)
2.000
Comments
Garry Joe and Leo Chiquito both worked in this room.
Notes
Close