CHCU Preservation Documentation Database
Login
Show Treatment wall
Vertical wall repair
Basal wall repair
repointing (sq ft)
8.200
masonry (sq ft)
-
stone site (number)
-
stone fresh (number)
4.000
capping (linear feet)
5.000
mortar (number of buckets)
3.500
Comments
Douglas Norberto and Garry Joe both worked
in this room.
Notes
Close