Repaired Roof
|
-
|
-
|
|
Repaired Blocked Doorway
|
Mon, 06 Dec 2004 08:57:38
|
Mon, 06 Dec 2004 08:57:38
|
|
Repaired Doorway
|
-
|
-
|
|
Built capping on wall
|
-
|
-
|
|
Repaired Hit / Damaged Wall
|
-
|
-
|
|
Repaired Hole in Veneer Stone Wall
|
Tue, 15 Feb 2005 13:18:40
|
Tue, 15 Feb 2005 13:18:40
|
|
Wall Installation
|
Wed, 03 Nov 2004 15:49:13
|
Wed, 03 Nov 2004 15:49:13
|
|
Replaced Fill Level Erosion
|
Tue, 15 Feb 2005 16:36:53
|
Tue, 15 Feb 2005 16:36:53
|
|
Built a Drywall
|
-
|
-
|
|
Reset the Wall
|
Fri, 03 Dec 2004 08:27:44
|
Fri, 03 Dec 2004 08:27:44
|
|
Respalling Completed
|
Thu, 28 Oct 2004 15:04:58
|
Thu, 28 Oct 2004 15:04:58
|
|
Reset Loose, Leaning, Bulging Lintel Stones
|
Tue, 15 Feb 2005 13:17:49
|
Tue, 15 Feb 2005 13:17:49
|
|
Reset Loose Door Sills
|
Tue, 08 Feb 2005 08:42:37
|
Tue, 08 Feb 2005 08:42:37
|
|
Reset the Chinking Stone(s)
|
-
|
-
|
|
Capping Installed
|
-
|
-
|
|