-
|
-
|
Poor
|
-
|
-
|
Mortar Erosion Poor, Eroded Stone(s) Poor
|
|
|
-
|
-
|
-
|
-
|
-
|
No Condition Assessment
|
|
|
-
|
-
|
-
|
-
|
-
|
Needs Repointing , Mortar Erosion
|
|
|
-
|
-
|
-
|
-
|
-
|
Basal Erosion , Mortar Erosion , Needs Repointing
|
|
|
-
|
-
|
Poor
|
-
|
-
|
Eroded Stone(s) Poor, Basal Erosion (mortar/stone) Poor, Mortar Erosion Poor
|
|
|
-
|
-
|
Poor
|
-
|
-
|
Mortar Erosion Poor
|
|
|
-
|
-
|
Poor
|
-
|
-
|
Veneer Stone Erosion Fair, Mortar Erosion Poor
|
|
|
-
|
-
|
Light
|
-
|
Light
|
Needs Repointing Light, Loose and fallen chinking Light, Mortar Erosion Light, … (4)
|
|
|
-
|
-
|
Severe
|
-
|
-
|
Mortar Erosion Severe
|
|
|
-
|
-
|
-
|
-
|
-
|
Needs Repointing , Basal Erosion , Veneer Stone Erosion
|
|
|
-
|
-
|
-
|
-
|
-
|
Eroded Stone(s) , Needs Repointing , Repatch wall , … (4)
|
|
|
-
|
-
|
-
|
-
|
-
|
Mortar Erosion , Loose and cracked Wall , Respalling , … (4)
|
|
|
-
|
-
|
-
|
-
|
-
|
Mortar Erosion , Basal Erosion , Needs Repointing , … (4)
|
|
|
-
|
-
|
-
|
-
|
-
|
Needs Repointing
|
|
|
-
|
-
|
-
|
-
|
-
|
No Condition Assessment
|
|
|