|
General Information
|
|
|
Start: 16/7/2013
|
|
End: 17/7/2013
|
|
Person days: 8
|
|
Comments: Basin installed in the north-eastern part of the room. Drainage pipes go through the north (connects to existing drainage) and east (doorway) walls. Runoff from Room 3a/92/97 drains into the basin in Room 108. Doorway wall that was built by crew is located on the east wall in this room.
|
|
| Specific Information |
|
| Cubic yards of fill: |
| Backfill source type: |
| Backfill other: |
| Cloth barrier type: |
| Cloth barrier other: |
| Other textile type: |
| Other textile other: |
| Other textile purpose: |
|
| Drain Information |
|
|
Inlet:
|
Joint:
| Y: |
90: 2 |
45: 1 |
22: |
Other: |
Other type: |
|
|
Drain pipe length: 15 feet 4 inches
Drain pipe diameter: inches
|
|
Avgerage height above geotextile: 2.0 feet
|
|
Drain pipe enters room through: Doorway
Other:
|
|
Drain pipe leaves room through: Beam Socket
Other:
|
|
Drain pipe leaves goes to: Room 3c/111
|
|
|
|
|