|
General Information
|
|
|
Start: Not specified/Not specified/2004
|
|
End: Not specified/Not specified/2004
|
|
Person days:
|
|
Comments: per drawing drain runs west through "bean hole" from 143 to 147. SE corner, dirt is 1" high
|
|
| Specific Information |
|
| Cubic yards of fill: 2.0 |
| Backfill source type: BLM Quarry |
| Backfill other: |
| Cloth barrier type: Geotextile |
| Cloth barrier other: |
| Other textile type: |
| Other textile other: |
| Other textile purpose: |
|
| Drain Information |
|
Inlet:
| T: 90 |
L: |
Other: |
Other type: |
|
Joint:
| Y: |
90: |
45: |
22: |
Other: |
Other type: |
|
|
Drain pipe length: feet
Drain pipe diameter: inches
|
|
Avgerage height above geotextile: feet
|
|
Drain pipe enters room through:
Other:
|
|
Drain pipe leaves room through:
Other:
|
|
Drain pipe leaves goes to: room 147, outside roomblock North
|
|
|
|
|