2000
|
Kin Kletso 29SJ 393
|
Room 52
|
1st Story
|
Start: 4/2000, End: 2000, No backfill documentation available. Backfill information was collected from photographic documentation or drainage maps. "After backfill" photos were orginally entered into database as a 2001 project, but the photos were part of the 2000 backfill project. The 2001 "after backfill" photos were merged into the Kin Kletso 2000 preservation records.
|
South, East, North
|
-
|
|
2001
|
Pueblo del Arroyo & Tri-wall 29SJ 1947
|
Kiva H
|
1st Story
|
-
|
South, East
|
Tso, Paul Sr.,
|
|
2002
|
Bc 59-Tom Matthew's Dig 29SJ 399
|
Room 26
|
1st Story
|
-
|
West, North
|
Tso, Paul Sr.,
|
|
2002
|
Bc 50-Tseh So 29SJ 394
|
Room 7
|
2nd Story
|
-
|
West, West, South, … (5)
|
Joe, Freddie,
|
|
2002
|
Zorro Bradley Site 29SJ 589
|
Structure Drain Pipe Assembly
|
1st Story
|
-
|
None
|
-
|
|
2002
|
South Gap Field School BC 126 29SJ 838
|
Site Overview Conveyor and set up
|
1st Story
|
Start: 5/2002, End: 5/2002
|
-
|
-
|
|
2002
|
South Gap Field School BC 126 29SJ 838
|
Room 5
|
1st Story
|
Start: 5/2002, End: 5/2002
|
-
|
-
|
|
2002
|
South Gap Field School BC 126 29SJ 838
|
Room 4
|
1st Story
|
Start: 5/2002, End: 5/2002
|
-
|
-
|
|
2002
|
South Gap Field School BC 126 29SJ 838
|
Unidentifiable Room
|
1st Story
|
Start: 2002, End: 2002
|
-
|
-
|
|
2002
|
South Gap Field School BC 126 29SJ 838
|
Kiva A
|
1st Story
|
Start: 5/2002, End: 5/2002
|
-
|
-
|
|
2002
|
South Gap Field School BC 126 29SJ 838
|
Structure Drainage Assembly in Shop
|
1st Story
|
-
|
None
|
-
|
|
2003
|
New Alto 29SJ 388
|
Room 24
|
1st Story
|
-
|
South, East
|
Joe, Garry,
|
|
2003
|
New Alto 29SJ 388
|
Room 25
|
1st Story
|
-
|
West
|
Joe, Garry,
|
|
2004
|
Pueblo Bonito 29SJ 387
|
Room 175
|
1st Story
|
-
|
South, North
|
-
|
|
2004
|
Pueblo Bonito 29SJ 387
|
Room 251
|
1st Story
|
-
|
North
|
-
|
|