2013
|
Pueblo Bonito 29SJ 387
|
Kiva Y - SW Interstice
|
1st Story
|
-
|
North, East, South
|
Sandoval, Emerson, , Martinez, Willard, photographer, Yazzie, James, photographer
|
|
2013
|
Pueblo Bonito 29SJ 387
|
Kiva Z
|
1st Story
|
-
|
NE Quad, SE Quad, SW Quad, … (4)
|
Suina, Harold, , Martinez, Willard, photographer, Yazzie, James, photographer
|
|
2013
|
Pueblo Bonito 29SJ 387
|
Kiva Z - NE Interstice
|
1st Story
|
-
|
North, East
|
Suina, Harold, , Martinez, Willard, photographer, Yazzie, James, photographer
|
|
2013
|
Pueblo Bonito 29SJ 387
|
Kiva Z - SE Interstice
|
1st Story
|
-
|
East, South
|
Suina, Harold, , Martinez, Willard, photographer, Yazzie, James, photographer
|
|
2013
|
Pueblo Bonito 29SJ 387
|
Room 102
|
2nd Story
|
-
|
East, West
|
Beyale, Victor, , Martinez, Willard, photographer, Yazzie, James, photographer, … (4)
|
|
2013
|
Pueblo Bonito 29SJ 387
|
Room 103
|
2nd Story
|
-
|
South, West
|
Beyale, Victor, , Martinez, Willard, photographer, Yazzie, James, photographer
|
|
2013
|
Pueblo Bonito 29SJ 387
|
Room 364
|
1st Story
|
-
|
West
|
Draper, Bryant, , Martinez, Willard, photographer, Yazzie, James, photographer
|
|
2013
|
Pueblo Bonito 29SJ 387
|
Room 93
|
1st Story
|
-
|
South, West
|
Suina, Harold, , Martinez, Willard, photographer, Yazzie, James, photographer
|
|
2013
|
Pueblo Bonito 29SJ 387
|
Room 3A/92/97
|
2nd Story
|
Start: 16/7/2013, End: 17/7/2013, A roof shelter was built to cover a stairway leading to lower rooms. The shelter was gated and locked for protection. A gutter was added onto the edge of the roof which drains to an inlet installed in the middle of the room. The inlet drains to a basin installed in Room 108. Before the room was backfilled, a 3' x 12" x 2" wall was built between the west wall and the exterior western wall of the stairway. Another wall (18" x 6" x 12") was built between the north wall and the exterior northern wall of the stairway. The existing wall in the doorway on the west wall was rebuilt, this wall covers the drainage pipe. The room was backfilled with dirt, the backfill was placed all around the room and sloped downward at a 2-5% grade to the center of the room. The crew hauled 4 bucket loads of dirt in the Bobcat.
|
North, East
|
Martinez, Wilmer, , Martinez, Willard, photographer, Yazzie, James, photographer
|
|
2013
|
Pueblo Bonito 29SJ 387
|
Room 108
|
2nd Story
|
Start: 16/7/2013, End: 17/7/2013, Basin installed in the north-eastern part of the room. Drainage pipes go through the north (connects to existing drainage) and east (doorway) walls. Runoff from Room 3a/92/97 drains into the basin in Room 108. Doorway wall that was built by crew is located on the east wall in this room.
|
North, West
|
Draper, Bryant, , Martinez, Willard, photographer, Yazzie, James, photographer
|
|
2013
|
Pueblo Bonito 29SJ 387
|
Room 109
|
2nd Story
|
-
|
East, West
|
Draper, Bryant, , Martinez, Willard, photographer, Yazzie, James, photographer
|
|
2013
|
Pueblo Bonito 29SJ 387
|
Room 101
|
1st Story
|
-
|
North, East, South, … (4)
|
Beyale, Victor, , Martinez, Willard, photographer, Yazzie, James, photographer
|
|
2013
|
Pueblo Bonito 29SJ 387
|
Room 107
|
2nd Story
|
-
|
North, East, South, … (4)
|
Beyale, Victor, , Yazzie, James, photographer, Martinez, Willard, photographer
|
|
2013
|
Pueblo Bonito 29SJ 387
|
Kiva Q
|
1st Story
|
-
|
SE Quad, SW Quad, NW Quad, … (4)
|
Suina, Harold, , Sandoval, Emerson, , Martinez, Willard, photographer, … (4)
|
|
1995
|
Pueblo Bonito 29SJ 387
|
Room 144
|
1st Story
|
-
|
North, East
|
Tso, Paul Sr.,
|
|