Pueblo Alto 29SJ 389 | Room: Room 141 | Story: 1st Story | Year 2001 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Walls recorded: South | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overall Comments: created to record photos without paper documentation. CAPPING. |
Pueblo Alto 29SJ 389 | Room: Room 141 | Story: 1st Story | Wall: South | Capping | Year 2001 |
Condition: |
Loose wall caps: Poor |
Stone Erosion: Poor |
Mortar Erosion: Poor |
Pueblo Alto 29SJ 389 | Room: Room 141 | Story: 1st Story | Wall: South | Capping | Year 2001 |
Treatment: |
Treatment comment: Capping was repaired with mortar and stone where needed. |