Wijiji 29SJ 577 Room: Room 25 N Story: 2nd Story Year 2001
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
BLM quarry Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, West, North
Start: 26/6/2001 End: 28/6/2001 Person Days: 1.0
 
Overall Comments:



Wijiji 29SJ 577 Room: Room 25 N Story: 2nd Story Wall: North Capping Year 2001
Condition
Condition:
Loose wall caps: Poor
Note:
     Original vertical wall measurements are 7.3 feet (length) and 3.7 feet (height).








Wijiji 29SJ 577 Room: Room 25 N Story: 2nd Story Wall: North Capping Year 2001
Treatment
Treatment:
Capping: 9.3
Treatment comment: Wall is 4 courses. Wal height measures 4.1 feet.








Wijiji 29SJ 577 Room: Room 25 N Story: 2nd Story Wall: West Capping Year 2001
Condition
Condition:
Loose wall caps: Poor
Note:
     Original vertical wall measurements are 11.4 feet (length) and 4 feet (height).








Wijiji 29SJ 577 Room: Room 25 N Story: 2nd Story Wall: West Capping Year 2001
Treatment
Treatment:
Capping: 18.2
Treatment comment: Wall is 4 courses. Wall height measures 4.2 feet.








Wijiji 29SJ 577 Room: Room 25 N Story: 2nd Story Wall: North Interior Year 2001
Condition
Condition:
Loose wall caps: Poor
Stone Erosion: Poor
Mortar Erosion: Poor








Wijiji 29SJ 577 Room: Room 25 N Story: 2nd Story Wall: North Interior Year 2001
Treatment
Treatment:
Repointing (sq ft): 5.0
Masonry: 3.0
Capping: 4.0
Mortar (# buckets): 3.0