Pueblo Pintado 29Mc 166 Room: Room 60 Story: 1st Story Year 2001
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, South, East
Start: 31/7/2001 End: 31/7/2001 Person Days: 1.0
 
Overall Comments:



Pueblo Pintado 29Mc 166 Room: Room 60 Story: 1st Story Wall: West Interior Year 2001
Treatment
Photo type: After 100502
Image #: 100502
Catalog #:        Accession #:
Treatment:
Treatment comment: Repair included repointing, masonry, and mortar work. Repair of basal erosion and stone replacement was done where appropriate.








Pueblo Pintado 29Mc 166 Room: Room 60 Story: 1st Story Wall: West Interior Year 2001
Condition
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor








Pueblo Pintado 29Mc 166 Room: Room 60 Story: 1st Story Wall: South Interior Year 2001
Condition
Condition:
Loose wall caps: Poor
Stone Erosion: Poor
Mortar Erosion: Poor








Pueblo Pintado 29Mc 166 Room: Room 60 Story: 1st Story Wall: South Interior Year 2001
Treatment
Treatment:
Stone replaced (#): 8.0
Capping: 5.0
Mortar (# buckets): 3.5








Pueblo Pintado 29Mc 166 Room: Room 60 Story: 1st Story Wall: East Interior Year 2001
Treatment
Photo type: After 100501
Image #: 100501
Catalog #:        Accession #:
Treatment:
Treatment comment: Repair included repointing, masonry, and mortar work. Repair of basal erosion and stone replacement was done where appropriate.








Pueblo Pintado 29Mc 166 Room: Room 60 Story: 1st Story Wall: East Interior Year 2001
Condition
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor