Pueblo Pintado 29Mc 166 Room: Room 7 A Story: 1st Story Year 2008
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
4.0 Outside park Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, East
Start: 15/9/2008 End: 16/9/2008 Person Days: 1.0
 
Overall Comments:



Pueblo Pintado 29Mc 166 Room: Room 7 A Story: 1st Story Wall: South Interior Year 2008
Condition
Photo type: Before 84247
Image #: 084247
Catalog #: 93902        Accession #: 811
Condition:
Mortar Erosion: Poor
Other Conditions:
     Eroded Stone(s) Poor
     Basal Erosion (mortar/stone) Poor
     Mortar Erosion Poor








Pueblo Pintado 29Mc 166 Room: Room 7 A Story: 1st Story Wall: South Interior Year 2008
Treatment
Photo type: After 84364
Image #: 084364
Catalog #: 93902        Accession #: 811
Treatment:
Repointing (sq ft): 8.0
Stone replaced (#): 2.0
Mortar (# buckets): 0.75
Treatment comment: Leo H. Chiquito worked in this room.
Other Treatment:
     Repaired Basal erosion (mortar/stone)
     Replaced Mortar
     Replaced Stone(s)








Pueblo Pintado 29Mc 166 Room: Room 7 A Story: 1st Story Wall: East Interior Year 2008
Condition
Photo type: Before 84335
Image #: 084335
Catalog #: 93902        Accession #: 811
Condition:
Loose wall caps: Poor
Other Conditions:
     Loose and cracked Wall Caps Poor








Pueblo Pintado 29Mc 166 Room: Room 7 A Story: 1st Story Wall: East Interior Year 2008
Treatment
Photo type: After 84363
Image #: 084363
Catalog #: 93902        Accession #: 811
Treatment:
Repointing (sq ft): 3.5
Stone replaced (#): 7.0
Capping: 3.5
Mortar (# buckets): 1.0
Treatment comment: Leo H. Chiquito worked in this room.
Other Treatment:
     Repaired loose and cracked wall