Pueblo Bonito 29SJ 387 Room: Room 28 A Story: 1st Story Year 2001
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, East, North
Start: Not specified/2001 End: Not specified/2001 Person Days: 3.0
 
Overall Comments: no B photos



Pueblo Bonito 29SJ 387 Room: Room 28 A Story: 1st Story Wall: South Interior Year 2001
Treatment
Photo type: After 99893
Image #: 099893
Catalog #:        Accession #: 756
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 6.0
Mortar (# buckets): 0.5
Treatment comment: .5 buckets duraweld








Pueblo Bonito 29SJ 387 Room: Room 28 A Story: 1st Story Wall: South Interior Year 2001
Condition
Condition:
Mortar Erosion: Poor








Pueblo Bonito 29SJ 387 Room: Room 28 A Story: 1st Story Wall: East Interior Year 2001
Treatment
Photo type: After 99892
Image #: 099892
Catalog #:        Accession #: 756
Treatment:
Treatment comment: Repair included repointing, masonry, and mortar work. Repair of basal erosion and stone replacement was done where appropriate.








Pueblo Bonito 29SJ 387 Room: Room 28 A Story: 1st Story Wall: East Interior Year 2001
Condition
Condition:
Mortar Erosion: Poor








Pueblo Bonito 29SJ 387 Room: Room 28 A Story: 1st Story Wall: North Interior Year 2001
Treatment
Photo type: After 99800
Image #: 099800
Catalog #:        Accession #: 756
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 20.0
Mortar (# buckets): 1.0
Treatment comment: 1 bucket duraweld








Pueblo Bonito 29SJ 387 Room: Room 28 A Story: 1st Story Wall: North Interior Year 2001
Condition
Condition:
Mortar Erosion: Poor