Kin Bineola 29SJ 1580 Room: Kiva 6 - Interstice Story: 1st Story Year 2001
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, East
Start: Not specified/Not specified/2001 End: Not specified/2001 Person Days: 4.0
 
Overall Comments: attach photos after Worthy batch-links



Kin Bineola 29SJ 1580 Room: Kiva 6 - Interstice Story: 1st Story Wall: South Interior Year 2001
Condition
Photo type: Before 99789
Image #: 099789
Catalog #:        Accession #: 756
Condition:
Mortar Erosion: Poor








Kin Bineola 29SJ 1580 Room: Kiva 6 - Interstice Story: 1st Story Wall: South Interior Year 2001
Treatment
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 9.0
Mortar (# buckets): 3.0








Kin Bineola 29SJ 1580 Room: Kiva 6 - Interstice Story: 1st Story Wall: East Interior Year 2001
Condition
Photo type: Before 99784
Image #: 099784
Catalog #:        Accession #: 756
Condition:
Mortar Erosion: Poor








Kin Bineola 29SJ 1580 Room: Kiva 6 - Interstice Story: 1st Story Wall: East Interior Year 2001
Treatment
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 7.0
Mortar (# buckets): 2.0