Kin Bineola 29SJ 1580 Room: Room 92 Story: 2nd Story Year 2006
Capping Mortars
# of buckets Source Material
2.0 Outside park Dirt Cans Cups of color
1.0 Purchase Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
2.0 Outside park Dirt Duraweld C (1:4)
1.0 Purchase Sand Duraweld (other)
Clay
Comments:
Walls recorded: South
Start: 15/5/2006 End: 15/5/2006 Person Days: 1.0
 
Overall Comments:



Kin Bineola 29SJ 1580 Room: Room 92 Story: 2nd Story Wall: South Interior Year 2006
Treatment
Photo type: After 82929
Image #: 082929
Catalog #: 85197        Accession #: 803
Treatment:
Repointing (sq ft): 7.0
Masonry: 8.0
Stone fresh: 20.0
Mortar (# buckets): 1.0
Treatment comment: Harold Suina worked in this room.
Other Treatment:
     Reset Loose, Leaning, Bulging Lintel Stones








Kin Bineola 29SJ 1580 Room: Room 92 Story: 2nd Story Wall: South Interior Year 2006
Condition
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor