Casa Chiquita 29SJ 1167 Room: Room 7 Story: 2nd Story Year 2004
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
4.0 Local source Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: West, South, East, North
Start: 5/5/2004 End: 6/5/2004 Person Days: 2.0
 
Overall Comments:



Casa Chiquita 29SJ 1167 Room: Room 7 Story: 2nd Story Wall: West Interior Year 2004
Condition
Photo type: Before 93723
Image #: 093723
Catalog #:        Accession #: 806
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Casa Chiquita 29SJ 1167 Room: Room 7 Story: 2nd Story Wall: West Interior Year 2004
Treatment
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 2.0
Mortar (# buckets): 0.5








Casa Chiquita 29SJ 1167 Room: Room 7 Story: 2nd Story Wall: South Interior Year 2004
Condition
Photo type: Before 93724
Image #: 093724
Catalog #:        Accession #: 806
Condition:
Mortar Erosion: Poor








Casa Chiquita 29SJ 1167 Room: Room 7 Story: 2nd Story Wall: South Interior Year 2004
Treatment
Treatment:
Treatment comment: Wall was repaired with repointing, masonry, and mortar. There is no treatment documentation.








Casa Chiquita 29SJ 1167 Room: Room 7 Story: 2nd Story Wall: East Interior Year 2004
Condition
Photo type: Before 93721
Image #: 093721
Catalog #:        Accession #: 806
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Casa Chiquita 29SJ 1167 Room: Room 7 Story: 2nd Story Wall: East Interior Year 2004
Treatment
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 2.0
Mortar (# buckets): 0.5








Casa Chiquita 29SJ 1167 Room: Room 7 Story: 2nd Story Wall: North Interior Year 2004
Condition
Photo type: Before 93722
Image #: 093722
Catalog #:        Accession #: 806
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Casa Chiquita 29SJ 1167 Room: Room 7 Story: 2nd Story Wall: North Interior Year 2004
Treatment
Treatment:
Vertical Wall Repair:
Repointing (sq ft): 9.0
Stone replaced (#): 18.0
Mortar (# buckets): 1.5