Casa Chiquita 29SJ 1167 Room: Room 18 W Story: 2nd Story Year 2004
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
3.0 Local source Dirt Duraweld C (1:4)
1.0 Purchase Sand Duraweld (other)
Clay
Comments:
Walls recorded: South, East, North
Start: 4/5/2004 End: 6/5/2004 Person Days: 3.0
 
Overall Comments: Harold Suina worked on North and East Walls on 5/11/2004, 1 manday.



Casa Chiquita 29SJ 1167 Room: Room 18 W Story: 2nd Story Wall: South Interior Year 2004
Condition
Photo type: Before 93672
Image #: 093672
Catalog #:        Accession #: 806
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor
Basal Erosion: Poor








Casa Chiquita 29SJ 1167 Room: Room 18 W Story: 2nd Story Wall: South Interior Year 2004
Treatment
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 6.0
Stone replaced (#): 4.0
Mortar (# buckets): 2.0








Casa Chiquita 29SJ 1167 Room: Room 18 W Story: 2nd Story Wall: East Interior Year 2004
Condition
Photo type: Before 93671
Image #: 093671
Catalog #:        Accession #: 806
Condition:
Mortar Erosion: Poor








Casa Chiquita 29SJ 1167 Room: Room 18 W Story: 2nd Story Wall: East Interior Year 2004
Treatment
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 5.0
Stone replaced (#): 3.0
Mortar (# buckets): 1.0
Basal Wall Repair:
Repointing (sq ft): 4.0
Masonry: 1.0
Stone replaced (#): 1.0
Mortar (# buckets): 0.5








Casa Chiquita 29SJ 1167 Room: Room 18 W Story: 2nd Story Wall: North Interior Year 2004
Condition
Photo type: Before 93670
Image #: 093670
Catalog #:        Accession #: 806
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Casa Chiquita 29SJ 1167 Room: Room 18 W Story: 2nd Story Wall: North Interior Year 2004
Treatment
Treatment:
Vertical Wall Repair:
Basal Wall Repair:
Repointing (sq ft): 4.0
Stone replaced (#): 2.0
Mortar (# buckets): 1.0
Treatment comment:
Basal Wall Repair:
Repointing (sq ft): 4.0
Masonry: 1.0
Stone replaced (#): 5.0
Mortar (# buckets): 0.5