Bc 51 29SJ 395 Room: Room 42 Story: 1st Story Year 1971
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
Dirt Duraweld C (1:4)
Sand Duraweld (other)
Clay
Comments:
Walls recorded: North, South, West
Start: 24/5/1971 End: 26/5/1971 Person Days: 3.0
 
Overall Comments:



Bc 51 29SJ 395 Room: Room 42 Story: 1st Story Wall: North Interior Year 1971
Condition
Photo type: Before Vol_59_v59_068
Image #: 065327
Catalog #: 66777        Accession #: 743
Condition:
Other Conditions:
     Loose or leaning or bulging masonry
     Eroded Stone(s)
     Basal Erosion
     Repatch wall








Bc 51 29SJ 395 Room: Room 42 Story: 1st Story Wall: North Interior Year 1971
Treatment
Photo type: After Vol_59_v59_069
Image #: 065328
Catalog #: 66777        Accession #: 743
Treatment:
Other Treatment:
     Reset loose, leaning, bulging masonry
     Replaced Stone(s)
     Repaired Basal erosion (mortar/stone)
     Repatched Wall








Bc 51 29SJ 395 Room: Room 42 Story: 1st Story Wall: North Interior Year 1971
Treatment
Photo type: Form Vol_59_v59_067
Image #: f04087
Catalog #:        Accession #:
Treatment:








Bc 51 29SJ 395 Room: Room 42 Story: 1st Story Wall: South Interior Year 1971
Treatment
Photo type: Form Vol_59_v59_067
Image #: f04087
Catalog #:        Accession #:
Treatment:








Bc 51 29SJ 395 Room: Room 42 Story: 1st Story Wall: West Interior Year 1971
Condition
Photo type: Before Vol_59_v59_068
Image #: 065327
Catalog #: 66777        Accession #: 743
Condition:








Bc 51 29SJ 395 Room: Room 42 Story: 1st Story Wall: West Interior Year 1971
Treatment
Photo type: Form Vol_59_v59_067
Image #: f04087
Catalog #:        Accession #:
Treatment: