Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 31 Interstice Story: 1st Story Year 2002
Capping Mortars
# of buckets Source Material
Dirt Cans Cups of color
Sand Describe Color:
Clay Duraweld-C (1:4)
Cement Duraweld-C (other)
Comments:
Wall Mortar
# of buckets Source Material
2.0 Dirt Duraweld C (1:4)
1.0 Sand Duraweld (other)
Clay
Comments:
Walls recorded: SW Quad, NW Quad, NE Quad
Start: 1/7/2002 End: 1/7/2002 Person Days: 1.0
 
Overall Comments:



Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 31 Interstice Story: 1st Story Wall: SW Quad Interior Year 2002
Condition
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 31 Interstice Story: 1st Story Wall: SW Quad Interior Year 2002
Treatment
Treatment:
Repointing (sq ft): 1.0
Stone replaced (#): 1.0
Mortar (# buckets): 0.5








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 31 Interstice Story: 1st Story Wall: NW Quad Interior Year 2002
Condition
Condition:
Stone Erosion: Poor
Mortar Erosion: Poor








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 31 Interstice Story: 1st Story Wall: NW Quad Interior Year 2002
Treatment
Treatment:
Repointing (sq ft): 1.0
Stone replaced (#): 1.0
Mortar (# buckets): 0.5








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 31 Interstice Story: 1st Story Wall: NE Quad Interior Year 2002
Condition
Condition:
Mortar Erosion: Poor








Bc 59-Tom Matthew's Dig 29SJ 399 Room: Room 31 Interstice Story: 1st Story Wall: NE Quad Interior Year 2002
Treatment
Treatment:
Repointing (sq ft): 1.0
Mortar (# buckets): 1.0